CFA piling

Continuous flight auger piling for foundations and piled retaining walls.

The right approach depends on the design, ground conditions, working platform and access. Our published projects show CFA piling used for both foundation support and basement walls.

The Heavies installing piles inside the retained King Street building in Newcastle

King Street, Newcastle

Foundation piles and shoring within a retained structure.

The site

Existing slabs and services restricted access. Old concrete and brick footings complicated drilling.

Our approach

Worked with Hunter Group’s site team and tight-access equipment to install foundation piles, contiguous wall piles and sheet piling.

Developer: Hunter Group. Engineer: Northrop.

Read the complete project
The Heavies basement and foundation works at Wamberal

Ocean View Drive, Wamberal

Foundation piles, basement walls, temporary propping and excavation.

The site

A beachfront residence required deep foundation piles and careful sequencing around temporary basement propping.

Our approach

Coordinated a package including CFA and screw piling, capping beams, temporary propping, bulk excavation and shotcrete. A hired rig provided the depth required for the foundation piles.

Builder: Tecorp. Engineer: Northrop Consulting Engineers. Architect: White Dickson Architects.

Read the complete project
Foundation and shoring works on the Blueys Beach headland project

Blueys Beach headland

Foundation and wall piles for a headland renovation.

The site

A complex headland renovation required foundation piles, a garage shoring wall and later a crane base. Ground and rock conditions differed from those anticipated.

Our approach

Discussed the encountered conditions with the engineers and adjusted some of the wall piles to a soldier-pile arrangement. The Heavies later completed additional crane-base and stair foundation piling.

Builder: J Moore Builders. Engineer: Collins & Associates. Geotechnical consultant: Regional Geotechnical Solutions.

Read the complete project

Our CFA capability

CFA diameters from 300–600 mm, to 15 m depth. Concrete is pumped through the hollow auger as it is withdrawn. Rig selection still depends on the design, ground conditions and working space.

Useful for your project

Read the CFA piling guide ↗

Equipment & capability details ↗

Talk through your site.

Call Daniel Goodman with the location, scope and timing. Drawings and geotechnical information are helpful when available.

0404 481 004Email Daniel

Working across Newcastle, the Central Coast and the Mid-North Coast.

Equipment & capability detailsTechnical resources