Foundation piles, basement walls, temporary propping and excavation.
The site
A beachfront residence required deep foundation piles and careful sequencing around temporary basement propping.
Our approach
Coordinated a package including CFA and screw piling, capping beams, temporary propping, bulk excavation and shotcrete. A hired rig provided the depth required for the foundation piles.
Builder: Tecorp. Engineer: Northrop Consulting Engineers. Architect: White Dickson Architects.