PROJECT EXPERIENCE / CENTRAL COAST
Avoca Beach wall piles

Architect: Slater Architects
Builder: Unique Building Partners
Engineer: Northrop Consulting Engineers
About as big as residential retaining walls get.
Heavy Foundations were engaged by Unique Building Partners in 2021 to complete the contiguous and soldier piles for a serious retaining wall.
Our scope included 53no. 450diameter and 600diameter reinforced concrete bored piles.
The existing surface of the site was steeply sloping, and the retaining walls were build along each boundary, so a large part of our work was planning and building the working platforms to keep our team and our drill rigs working safely and effectively on the site.
Talk through your site.
Call Daniel Goodman with the location, scope and timing. Drawings and geotechnical information are helpful when available.
0404 481 004Email DanielWorking across Newcastle, the Central Coast and the Mid-North Coast.
Contact & office locationsTechnical resources