Newcastle & Lake Macquarie

Newcastle bored piling
& retaining walls.

Newcastle piling contractors specialising in concrete bored piles, CFA piling and piled retaining walls for basements, substantial site cuts and technically demanding residential sites.

Discuss your project
Merewether, NewcastlePiling on a restricted residential site

The right approach
for the ground and the site.

Heavy Foundations installs piling and retention systems for builders, homeowners and project teams across Newcastle and Lake Macquarie. Access, neighbouring structures and the engineer’s design shape how we approach each job.

01

Concrete bored piling

Conventional bored piles and bored piers for residential foundations, additions and substantial structures. Installation planned around access, ground conditions and the required founding material.

02

CFA piling

Continuous flight auger piles for foundations and retaining systems where specified. Our local work includes CFA installation around existing structures and constrained working areas.

03

Piled retaining walls
& basement shoring

Contiguous pile walls, foundation piles and associated retention works for basement excavations, steep sites and deep cuts. A site cut does not need to be a basement to need a considered piling solution.

Explore our capabilities

Work with local context.

"Better than LEGO!"

Piling and retaining wall works on the narrow Newcastle East residential site
Newcastle East · Contiguous pile walls and foundations
Newcastle East

A retaining wall package
on a site under 6 metres wide.

At Murray Avenue, the work brought together contiguous pile walls and foundation piles on a steep, narrow residential block. Hard rock, changing levels and neighbouring shallow footings demanded careful staging.

Excavators and a masted rig worked through successive stages, with temporary support where needed to manage sand migration and protect adjoining ground.

Builder
GTS Constructions
Architect
Curious Practice
Engineer
Izzat Consulting Engineers
Read the Newcastle East project
King Street, Newcastle CBD

New foundations within
an existing structure.

For Hunter Group’s serviced apartment project, The Heavies installed foundation and shoring piles around an existing carpark structure. Old footings, overhead slabs and services restricted access.

Working with the site team, we installed the required piling for the new lift core while the surrounding structure was retained.

14
600 mm contiguous wall piles
to 7 m depth
12
600 mm CFA foundation piles
to 9 m depth

Scope also included sheet piling. Engineer: Northrop.

Read the King Street project
Heavy Foundations piling equipment working within the King Street Newcastle project
Newcastle CBD · Foundation piles, shoring and sheet piling

Successful projects start with The Heavies.

Explore piling and retaining work
across Newcastle and the surrounding region.

Loading project map…

Pins identify selected sites where we have carried out work. Locations are address-based; they are not survey set-out points. Address locations: NSW Spatial Services.

A useful conversation
can start early.

You do not need a completed set of plans to get in touch. An address, an idea and a conversation about the site are a useful starting point. We can work with your engineer or recommend suitable engineers when needed.

Understand the constraints

Site access, working space, existing structures, services and ground information help establish a practical installation approach.

Coordinate the details

Structural and geotechnical information inform pile selection and construction. We coordinate our installation with the project’s design and site team.

Plan the sequence

Working platforms, spoil handling, reinforcement and concrete deliveries need to fit the site and the build programme.

Can you build retaining walls for a deep site cut without a basement?

Yes. Our piled retaining work includes substantial site cuts and changes in level as well as basements. The appropriate wall system and construction sequence depend on the engineer’s design, ground conditions and surrounding structures.

What is the difference between bored piles and CFA piles?

Conventional bored piling forms a bore before reinforcement and concrete are installed. CFA piling places concrete through the hollow auger as it is withdrawn. The project engineer’s requirements, ground conditions and site constraints determine the appropriate method.

Can you work close to existing homes and in restricted access?

Our Newcastle East and King Street projects both involved tight access and existing structures. Every site needs its own review of available working space, equipment, temporary support and installation sequence.

What should I send with an enquiry?

Start with the site address and a short description of the proposed work. If available, include architectural or structural drawings, a geotechnical report and photos showing access. Plans are helpful, but you are welcome to call before they are complete.

From the ground up.

See the team and equipment at work in Newcastle and Lake Macquarie.

Restricted working space and reinforcement during Heavy Foundations work at Merewether
Merewether · Project photography by Beau Pilgrim

Call in The Heavies.

Tell us about the site and what you have in mind.

0404 481 004danny@theheavies.com.au

Talk to Daniel Goodman

Newcastle office

61/63 Parry Street
Newcastle West NSW 2302
Find us on Google

Good People,
Great Handshakes
& Remarkable Work.