MacMasters Beach retaining wall package

In 2021, Heavy Foundations were engaged by W Residential to carry out a decent shoring and foundations package with limited access at 15a Tudibaring Parade, MacMasters Beach.

Our scope included:

  • contiguos cfa bored pile shoring;
  • capping beams;
  • shotcrete; and
  • foundation bored piles.
macmasters beach retaining wall package — site photographs
macmasters beach retaining wall package — site photographs
macmasters beach retaining wall package — site photographs

With the site being on high ground near the beach, the foundation piles were slightly over 9m deep to account for the zone of reduced foundation capacity. In a large storm, the design at our part of the project allows sand to be eroded from near the house with the piles embedded deep enough to transfer loads to a layer of stable material - minimising potential landslides and avoiding building failure.

macmasters beach retaining wall package — site photographs

Talk through your site.

Call Daniel Goodman with the location, scope and timing. Drawings and geotechnical information are helpful when available.