2014 / UNOPS, BELIZE
Responsibility
on the ground.
In 2014 a multi-partner program was developed to strengthen Belize's health services and included the construction of some new physical infrastructure. I was allocated as the in-country Construction Supervisor for the design and construction of three hospital extensions and one new facility.
I am particularly proud of my success in keeping the Contractors happy and motivated while pushing them well beyond their contractual obligations and the existing standards of quality, safety and technology. Early on, for example, while reviewing the structural designs I identified significant failures of buildings foundation design and the local technical knowledge, and was able to mediate and manage appropriate corrections with the designers and Contractors without major delays, cost variations or the early breakdown of relationships.
To the same extent, I am also fond of the cooperative and social relationships that I built with the local PAHO team, EU delegates and especially the Ministry of Health engineering department - all legends, which I feel helped the reception of the project by the government and local community.
While I am very proud of my achievements in Belize and believe the project was a good use of European Union funding, the design and construction process was not perfect and there were short falls that I was able to observe and take lessons from. I believe that I walked away from that great experience with well-rounded knowledge and serious confidence in my ability for ethical, responsible and productive independent decision making.
Technical judgement, clear communication and responsibility for the outcome.