HEAVY FOUNDATIONS PTY LTD

Screw piling

Screw piling as part of the foundation package.

Screw piling forms part of our core capability and was included in the Wamberal basement package. Discuss the design, access and certification requirements with our team.

The Heavies basement and foundation works at Wamberal

Ocean View Drive, Wamberal

Foundation piles, basement walls, temporary propping and excavation.

The site

A beachfront residence required deep foundation piles and careful sequencing around temporary basement propping.

Our approach

Coordinated a package including CFA and screw piling, capping beams, temporary propping, bulk excavation and shotcrete. A hired rig provided the depth required for the foundation piles.

Builder: Tecorp. Engineer: Northrop Consulting Engineers. Architect: White Dickson Architects.

Read the complete project

Screw piles & certification

Our largest published installation to date used a 900 mm helix to 29 m depth. Auger and screw drives range from 1,750–91,200 Nm. The design, geotechnical information and certification requirements need to be considered together.

Useful for your project

Read the screw pile certification guide ↗

Equipment & capability details ↗

Talk through your site.

Call Daniel Goodman with the location, scope and timing. Drawings and geotechnical information are helpful when available.

0404 481 004Email Daniel

Working across Newcastle, the Central Coast and the Mid-North Coast.

Equipment & capability detailsTechnical resources